Just a short post tonight to show some progress. The guys are doing a great job, as you can see things are moving right along. All of the lower cabinets have been installed. Wiring has been put in for lighting above the sink and for a switch to the existing ceiling fan/light. We weren't overly surprised to learn that there's nearly a three inch differential from the highest point of the kitchen floor to the lowest. Long time readers may recall that we had foundation work done about a year ago, under this area of the house. However, had that work included any further raising or attempted leveling, it would have potentially put the windows in this area out of alignment or just flat out broken them. We're very happy with the progress so far.